8 April 2019RTI-471

Ministerial briefing notes and attachments, reports and internal correspondence (please limit searches to QR Chief Executive Officer Nick Easy, Executive General Manager People and Culture, Executive General Manager) relating to:
1. Delays in the Workplace Management System
2. Damages involving system vendor GIRO due to delayed implementation
Timeframe: 1 January 2018 to 10 January 2019

Seven Network (Operations) Limited

Application finalised

1 March 2019RTI-474

All available design and as-constructed engineering information for the Brisbane Terrace overbridge near Redbank station at 25.930km on Main Line. Any dilapidation inspection reports that have been carried out on the structural integrity of the bridge.
Timeframe: January 1950 - January 2019

AT&L and Associates Pty Ltd
Application finalised

15 March 2019RTI-468
1. All reports of the fire at Berajondo from between 4 and 6 September 2018.
2. All reports of the fire at Colosseum from 6 September 2018 to present.

Member of Public
Application finalised

24 May 2019RTI-483

Slip and fall incidents on or around the stairs connecting platforms 2 and 3 to the underground pedestrian underpass at the eastern encl of the Darra railway station;
a slip and fall incident on or about 24 August 2017 on or around the stairs connecting platforms 2 and 3 to the underground pedestrian underpass at the eastern end of the Darra railway station.
Time period 2003 - 19 February 2019

20 June 2019RTI-485

CCTV footage of an incident that occurred on Thursday 21 March 2019 when a truck hit a rail bridge located at Logan Road Buranda.

Energy Queensland Limited

Application Finalised

18 July 2019RTI-489

Lift maintenance records for the Varsity Lakes lift for the period to cover 18 November 2018."

Member of Public
Application finalised

15 October 2019RTI-491

1. Records of strikes on the rail bridge on Pickering Street, Gaythorne between June 2014 - June 2019.
2. Documents in relation to completed or planned bridge strike mitigation works for the rail bridge at Pickering Street, Gaythorne between June 2009 - June 2019.

​CMC Lawyers